| 1. | The labor quota of long - distance pipeline construction 长输管道敷设工程劳动定额 |
| 2. | Labor quota for seismic prospecting with portable rig 人抬钻地震勘探劳动定额 |
| 3. | Labor quota for seismic prospecting with truck - mounted rig 车装钻地震勘探劳动定额 |
| 4. | Labor quota of seismic prospecting with vibrator 可控震源地震勘探劳动定额 |
| 5. | Labor quota of gas transmission engineering 输气工程劳动定额 |
| 6. | Labor quota of gas production engineering 采气工程劳动定额 |